Conservatory Base

Soon after beginning excavation work Pete discovered traditional foundations would not be adequate for the poor ground conditions.

Pete had several quotes from mini piling specialists before getting in touch with Micropiles. After looking at the plans Micropiles quickly provided a quote for a complete foundation package including concrete.

Pete prepared the site by excavating a trench around the perimeter wall. Micropiles completed installation In just 1 day with concrete being poured on the second day.